HEBEI WELDING EQUIPMENTS CO., LTD

 

 

    UNJ-10/25/50 saws the strip flash welding machine explanation

 First, main engineering data

Parameter model

Fixed

Capacity

(KVA)

Input

Voltage

(V)

Input

Power source

(A)

The rated load continues to lead

(%)

Adjustment progression

 

Output idling voltage

(V)

The welding saws the strip

The width is biggest

(mm)

Welding

Saws the strip thickness

(mm)

UNJ-10

10

380

26.3

20

8

 

50

0.4-1.2

UNJ-25

25

380

39.5

20

8

 

125

0.4-1.2

UNJ-50

50

380

78.9

20

8

 

150

0.4-1.2

Second, structure and principle of work

    This welding machine by the rack, the machine part, the electric department classifies is composed.

    1. Rack: The rack becomes by the angle steel and the steel plate welding, the internal installation transformer, the contact device and so on the complete electricity are partial, outside has the side gate which shell and may open favor the overhaul.

    2. Machine part: By the shell, saw slice clamps the organization, the welding forging and pressing handle, skids and so on is composed for the organization.

    3. Electricity partial: By the transformer, welds the switch, the tempering button, the exchange contact device and so on is composed.

Third, principle of work

    This machine for the flash welding machine, the flash welding merit is the metal and the alloy scope which may weld extremely widespread, certain weldments are very difficult with other welding crafts the alloy which welds cannot even weld, may weld with the flash welding.

    The flash welding has two methods: 1. Continual flash welding. 2. Preheating flash welding.

    1. Continual flash welding: Clamps the weldment, moves the jig gently contacts when two weldments, namely opens causes the circular telegram, heats up and has liquid metal the spark Liang which the contact point heats up forms which demolishes to spray, forms the continual flash, when the flash heats up to the suitable temperature, moves the jig suddenly to accelerate, causes the weldment end surface by the very tremendous pressure mutually to extrude, the rupturing current, the adjoining plane place mutually crystallizes immediately, but forms the reliable attachment, this stage for forging and pressing, the flash heats up with forging and pressing pressurizes is the flash welding main stage, the preheating flash is the butt welding in front of the continual flash first preheating.

Fourth, application method

    1. The saw strip which will weld (or steel belt) the beginnings and ends will cut neat, then will saw the strip to put in the welding machine in two electrodes clamp, will attach to Qi Ding is tightening the handle together. First clamps saws the strip, then moves welds the handle, presses down welds the button is the transformer circular telegram, by now sawed the strip to start the flash to melt, when the flash heated up to the suitable temperature, moved the handle suddenly accelerated, caused by the very tremendous pressure to saw the strip mutually to extrude, the rupturing current, by now welded the area adjoining plane place alternately to crystallize immediately, the welding finished.

    2. Completes after the welding, the pine opens contracts the installment, puts aside two pole plates about the about 2.5 centimeters, causes the crater to occupy two electrodes middle positions, then contracts, presses down the tempering button, (according to tempering button when must pay attention to this welding machine to be supposed to use pulse interrupted tempering method, after namely presses down button pine to open immediately, then continuously interrupted presses down button) simultaneously to observe saws the strip crater place, assumes brown (temperature approximately when 580 ≧ -630 ≧) stops the tempering, the tempering not to have darkly to cause to saw the strip to present brightly is red, if has the bright red explanation tempering hyperpyrexia, after must cause to saw strip cooling to carry on the second tempering again, Otherwise cannot use. (16-30, when welding may 1-7 grade, when tempering must dial to 8 grades.)

Fifth, low-carbon steel plate flash welding allowance and time reference value

The board  is thick (mm)

Flash allowance

(mm)

forging allowance

(mm)

Swinging radius

(mm)

After welds the electrode

(mm)

Total allowance (mm)

Flash time (s)

         1

4.4

1.6

5.5

5.0

6.0

1.75

        1.5

5.8

2.2

7.5

7.0

8.0

2.25

        2.0

8.0

3.0

10.25

9.5

11.0

4.0

         3

11.2

4.3

14.5

13.5

15.5

6.25

         4

14.7

5.3

19.0

18.0

20.0

9.0

         5

16.7

6.3

22.5

22.0

23.0

12.0

         6

18.0

7.0

25.0

25.0

25.0

16.0

         8

22.0

8.0

30.0

30.0

30.0

25.0

         10

23.0

9.0

33.0

34.0

32.0

34.0

 

Sixth, electrical schematic diagram

     

back